Please enter your password: |
Password: |
20 | Interstate, Primary & Urban Projects |
20 | Responsibility: Programming and Scheduling Division (Interstate and Primary Systems), Urban Division (Urban Systems). Begins: When request is received for PE |
20 | to be authorized. Ends: When PE is authorized and proper divisions are notified. |
20 | Norms: 1 Month. |
20 | Secondary Projects |
20 | Responsibility: Secondary Roads Division (Secondary Systems). Begins: When they receive the County budget. Ends: When the County Budget is reviewed, approved, |
20 | and submitted to Fiscal Division, and PE for the individual project is open to charges. |
20 | NOTE: On those few Secondary projects which involve Federal funding in PE, the end |
20 | date of Activity 12 would be when FHWA authorizes PE. |
24 | Sec. 2.02 Surveying Party Equipment Inventory and Major Equipment database |
56 | Target Dimensions |
65 | Line Style |
65 | Weight |
65 | DTM Data Source |
65 | LEVEL |
65 | DTM Data Source |
65 | LEVEL |
67 | “X” Configuration Helicopter Target Dimensions |
88 | Link: http://vdotforms.vdot.virginia.gov/SearchResults.aspx?strFormNumber=LD-393 |
88 | / |
129 | Required: L1 and L2 |
200 | Sec. 13.01 Introduction |
200 | Sec. 13.02 Standards and Policy |
200 | Standards: |
200 | Policy: |
201 | Designation: |
201 | Sec. 13.03 Workflow Process |
201 | Designation: |
202 | Utility Location (Test-holes) |
202 | Determination |
203 | Requesting Locating (Test-holes) Information (Project related) |
203 | Requesting Locating (Test-holes) Information (Non-Project related) |
204 | Sec. 13.04 Data Distribution |
204 | Sec. 13.05 Evaluation of Location (Test-hole) Data |
205 | Sec. 13.06 Roadway and Utility Field Inspections |
205 | Construction Plans |
206 | APPENDIX A |
216 | SPIRAL CURVES |
217 | TRANSITION (SPIRAL) CURVES |
218 | APPENDIX C |
218 | Model Virginia Map Accuracy Standards |
218 | National Map Accuracy Standards |
219 | Commonwealth of Virginia |
219 | Model Virginia Map Accuracy Standards |
220 | Preface |
222 | TABLE OF CONTENTS |
223 | SECTION 1 |
224 | MAP ACCURACY STANDARDS |
230 | EXPLANATORY COMMENTS |
235 | With a view to the utmost economy and expedition in producing maps which fulfill not only the broad needs for standards or principal maps, but also the reasonable particular needs of individual agencies, standards of accuracy for published maps are de |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 | ![]() |
11 | ![]() |
23 | ![]() |
27 | ![]() |
32 | ![]() |
54 | ![]() |
89 | ![]() |
92 | ![]() |
11 1 | ![]() |
14 8 | ![]() |
15 2 | ![]() |
18 6 | ![]() |
18 7 | ![]() |
19 9 | ![]() |
20 6 | ![]() |
20 7 | ![]() |
21 8 | ![]() |
For Page Number: | |
Bookmark Text: | |
Bookmark Color: |
Title: | SurveyManual |
Company: | Virginia Department of Transportation |
Website: | http://www.virginiadot.org/ |
Address: | 1401 East Broad Street |
![]() |
Copyright © 2007-2016 Revanton Pte. Ltd. www.flipviewer.com HTML5 Viewer - Version 1.8.4 Build 142 |
Protected by U.S. Patent No. 6,064,384; 6,407,757; 6,496,803; 6,701,301; 6,725,203; 6,762,775; 6,976,225; 7,079,111; 7,165,039; 7,376,582; 7,555,724 Other Patents Pending. All Rights Reserved. |
![]() |
Click on the "Download" button to view and download this publication in the FlipViewer Offline App |